Skip to content
Talk to us →︎
←︎ All articles

How I rebuilt a hospital from its planning documents with AI

The 3D hospital model with its floors pulled apart and Level 4 highlighted, beside a list of levels and a tag showing the 4.8 metre floor-to-floor height is sourced

A large new hospital gets planning consent. The public record runs to hundreds of pages: an environmental statement, design and access papers, a few sketches, some news coverage. Somewhere in there is the building. I wanted to see whether AI could find it and build it, using nothing but those public documents.

It could. The model is live on our construction page, where you can orbit the site, walk up to the main entrance and pull the floors apart. This post is how I built it, what the AI did well, and where it had to guess.

01What went in

Only public material: the planning application papers, the environmental statement, the published design sketch of the entrance, and news coverage of the scheme. No drawings from the contractor or the architect, and no access to anyone's design models.

That rule mattered more than anything else. Everything in the model had to trace back to a document anyone could download. Anything that couldn't be traced had to be marked as a guess.

I worked in Claude Code. I gave it the folder of downloaded documents and a short brief: build the scheme as a 3D model, from these files only, and write down where every number comes from. Claude wrote Python scripts that ran Blender, the free 3D software, in the background, so the AI built the model rather than me. I looked at the renders and told it what was wrong. At the end it hands over a draft file that I can open in Blender and fine-tune by hand.

02How the build ran

I didn't ask for "a 3D hospital" in one go. The build ran in stages, and I checked each one before the next started.

  1. Research. The AI read the documents and pulled out every fact it could use: storeys, maximum heights, floor-to-floor heights, where the entrance faces, which buildings sit around it. It listed each fact with the document it came from.
  2. Assumptions, written down. Where the documents were silent, it said so and proposed an estimate. Nothing got invented quietly.
  3. Simple masses first. Plain blocks for the main building, the car park and the neighbouring buildings, seen from above and at an angle. The only question at this stage: does this look like the scheme?
  4. Detail where it counts. Once the massing was right, we worked on the entrance: the glazing, the towers either side, the rhythm of the facade, read from the published sketch.
  5. Compare and correct. I put the model next to the source sketch and the documents and looked for what was wrong. The AI fixed it, and we compared again.
  6. Make it explorable. The finished model went into a viewer that runs in a web browser, with three views: the site and its setting, the main entrance at eye level, and the structure with the floors pulled apart.
The hospital model on its site, seen from above, with numbered points for the new hospital, the glazed main entrance, the multi-storey car park and other buildings, and a side panel of key points
The first view: the new hospital inside its consented zone, with the buildings around it. Each numbered point opens a note on where that fact came from.

The best catch wasn't mine. In the first version every floor was 4.2 metres apart. That number wasn't in any document: it was a sensible-looking guess. Because I kept asking the AI to check its work against the sources, it went back through them and found the real figure itself, in chapter 2 of the environmental statement, which gives a standard floor-to-floor height of 4.8 metres. It rebuilt the floors at 4.8 metres and marked the figure as sourced. Six floors at 4.8 metres still sits well under the 40 metre height limit, so the numbers agreed with each other too. That is why the checking step matters: ask it to check, and check again.

The whole build took about three hours, and most of that was rendering.

03What came straight from the documents

More than I expected. The consent allows six storeys plus plant, up to 40 metres, so that's what the model holds. The environmental statement gives a standard floor-to-floor height of 4.8 metres, because the scheme follows the NHS's standard hospital design (Hospital 2.0), so every floor in the model sits 4.8 metres above the one below. The entrance faces the way the documents say it does, and the glazed hall where the wings meet sits where the sketch puts it.

The hospital model with its six floors and roof pulled apart into separate layers, beside a list of levels from Level 0 at 0 metres to the roof and plant at 28.8 metres
The structure view. Every floor sits 4.8 metres above the one below, the figure from the planning environmental statement.

The AI was good at this part. Reading a long environmental statement and finding the one paragraph that gives you a floor height is slow, careful work for a person. It did it quickly and showed me where it found each figure, so I could check.

04Where it had to guess

Plenty, and the model says so. Click any part of it and the note tells you whether that figure is sourced or estimated.

  • The standard design mandates a universal structural grid, but its spacing isn't published. The columns sit on an estimated 8.4 metre grid to show the idea, not the design.
  • Facade panel sizes are invented. The pattern of terracotta piers and glazing strips is read from the sketch, but the dimensions aren't in any public document.
  • Roof plant tops out at about 34 metres, under the 40 metre limit, but its layout is invented.
  • Paving, trees, seating, people and cars are there to show scale. None of them is from a drawing.

The scheme only has outline consent, so the design itself is still illustrative. The model is a reading of the public record, not the building as it will be built.

A presentation board: an eye-level render of the hospital's glazed entrance between two terracotta towers, with a front elevation, a ground floor plan marked with an estimated 8.4 metre grid, and a section across the approach road
The finished board. The drawings are generated from the model, and the plan says plainly that the grid is estimated.

05What I'd reuse

Once the hospital worked, I turned the steps into a reusable skill: a written set of instructions the AI follows, from the sources list and the assumptions table to the model, the board and the web viewer. I tested it on two more buildings, a cancer support centre and a university science building, so the next model starts from a process that already works instead of from a blank page.

Two more models built with the same skill, each with its structure pulled apart: a long single-storey centre with its timber roof frame lifted above the rooms, and a multi-storey building showing a kept concrete frame in orange beside new steel in blue
The same skill on two more buildings. Left, a cancer support centre with its timber roof frame lifted off. Right, a university science building, with the kept concrete frame in orange and the new steel in blue.

06Why this matters if you build things

Nothing here needed the design team's files. That's the point. If AI can do this from public documents, it can do a lot with the documents you already hold.

  • Bids. A model of the client's scheme, built from their own planning papers, before you've been handed a single drawing.
  • Early checks. Massing against the consent limits, or a quick look at how a site sits with its neighbours.
  • Explaining a scheme. A link that a client, a board or a community group can open on a phone and walk around, instead of a stack of PDFs.

It won't replace the architect's model or the BIM. It's a fast, honest first picture, with its guesses on show, that gets the right conversation started sooner.

We did the same thing for a university science building that's going up now. Both models are on the construction page, next to 40 ways contractors can put AI to work. If you'd like to see one built from your own documents, talk to us.

Want help putting this to work?

We help organisations turn ideas like this into everyday practice, with training, a platform and practitioners who do the work alongside you.